Skip to content

NDCs and National Targets

Testing a country's climate pledge and renewable targets in its own power system

What is in the model today

The country's published renewable targets. Every build carries a table of the country's renewable targets, from Ember's compilation of national targets: target year, technology, metric (capacity, generation or share), value, and the source document with its publisher, date and link. It is in the re_targets sheet of SuppXLS/Scen_Base_VS.xlsx. For Germany it includes:

Target year Technology Target Source
2030 Solar 215 GW Easter Package (in law), 2022
2030 Onshore wind 115 GW Easter Package (in law), 2022
2030 Offshore wind 30 GW Updated NECP, 2024 (30.5 GW in the Easter Package)
2030 Renewables 80% of consumption Easter Package (in law), 2022

The table is a reference, not a constraint: the reference model is free to fall short of the targets or exceed them, which is what lets an assessment measure the gap.

Carbon-price pathways. Five IPCC AR6 climate categories are carried in the scenario file, from 1.5°C (C1) to above 3°C (C7), each with its regional carbon-price path and consistent demand growth; one input cell chooses between them. See Fuel and Carbon Prices.

A base year tied to statistics. Base-year capacity matches official statistics by construction, and fuel use is checked against UN statistics, so base-year emissions start from the right place. See Calibration & Checks.

Plants by name. Large units are in the model one by one, with their location and age, so a commitment about specific plants (a coal phase-out date, a nuclear life extension) can be applied to those plants.

What the user sets

  • Which targets to impose, and how. Capacity targets become bounds on installed capacity by year (CAP_BND); share targets become a user constraint on generation shares. Unconditional and conditional NDC targets are naturally two scenarios.
  • The power sector's share of an economy-wide pledge. Most NDCs are economy-wide. The power sector's part of the target is a judgement; once made, it becomes a cap on power-sector CO₂ by year (COM_BNDNET on the emission commodity).
  • Plant-specific commitments, such as retirement dates for named units.

What it can show

  • The cost of meeting the targets, against the reference.
  • Whether capacity targets fit the country's land, weather and grid: where new wind and solar would go, which corridors would be loaded, and which nodes would carry the burden.
  • The carbon price implied by an emissions cap (its shadow price), to compare with the AR6 pathways.
  • Whether meeting the renewable targets is enough to meet the emissions target, or the other way round.

Not built yet

  • NDC emission targets are not imported automatically; the user enters them.
  • The models cover the power sector. Pledges that rely on other sectors need multi-sector models, which are in development.