Glossary¶
Key terms and acronyms used in VerveStacks
Technical Terms¶
- Bus (grid node)
-
A real high-voltage substation kept as a point in the model's network, where generation and demand are attached. Documentation uses node; code and file names use bus. In the TIMES model the electricity commodity at a node is
e_<node>. See Grid Representation. - Cluster
-
A group of wind or solar cells around one grid node, treated as one investment option with its own hourly profile. See Renewable Energy Characterization.
- Corridor
-
All the transmission lines between two nodes, taken together.
- FLO_MARK
-
A VEDA/TIMES parameter that bounds the share of a commodity's flow that a given process must supply. VerveStacks uses
FLO_MARK~lo = load_share × 0.98on demand-technology processes so that each node serves its share of demand; see how demand enters the model. - LCOE
-
Levelized Cost of Electricity - the average cost per unit of electricity generated over the lifetime of a technology.
- Load share
-
The fraction of national electricity demand attributed to one node. There are two: a population share, used for buildings and transport, and an industry share. See demand placement.
- NTC
-
Net Transfer Capacity - the maximum transmission capacity between regions.
- REZ
-
Renewable Energy Zone - areas with high renewable resource potential.
- Stress Period
-
Time periods when the energy system experiences operational challenges due to supply-demand imbalances.
- Timeslice
-
Representative time periods used to aggregate 8760 hourly data into manageable segments for optimization.
- VerveStacks
-
Verve (vigor, energy, passion) + Stacks (the layered scenario-assumption sets that an analysis explores — data, technology, policy, demand, grid, and temporal layers). The name came first; the backronym below was fitted afterward. The intent: a stack-based environment that preserves the energy and momentum of modeling while hiding unnecessary complexity — closer in spirit to creative tools than to a solver. See also the FAQ: Technical Questions.
Acronyms¶
- AR6
-
IPCC Sixth Assessment Report climate scenarios
- DBSCAN
-
Density-Based Spatial Clustering of Applications with Noise
- EMBER
-
Energy and climate think tank providing electricity data
- GEM
-
Global Energy Monitor - power plant database
- IRENA
-
International Renewable Energy Agency
- TIMES
-
The Integrated MARKAL-EFOM System energy modeling framework
- VEDA
-
Versatile Energy Data Analyst - interface for TIMES models
- VerveStacks (backronym)
-
Versatile Engine for Regional and Varied Energy scenarios - a post-hoc expansion of "Verve." The acronym explains the letters; the name conveys the philosophy.
Note