Every power unit in the country, with its own numbers, at its place on the grid

Watch first: Germany's Power Fleet (1:48, narrated). Generated from a real build of the German model; every number on screen traces to a file. The sections below follow the video in the same order, with the rules and file names behind each step. Also: interactive version · India · all method videos.

Each country model starts from an inventory of the power units that exist. The inventory is built from unit-level data, completed with national statistics where the unit data falls short, and checked against independent statistics. Doing this once, in the open, replaces work that many teams otherwise repeat separately.

The method in six steps

  1. Units. Take every unit in the country from Global Energy Monitor.
  2. Status. Decide what counts as the existing fleet.
  3. Characterise. Give each unit a fuel, a technology and its own cost and performance numbers.
  4. Group. Keep large units individually; pool small ones.
  5. Fill the gaps. Add the capacity the unit data misses, from IRENA and Ember.
  6. Check. Compare the fleet with independent statistics.
Germany India
Units in Global Energy Monitor 12,088 8,286
Kept as individual units 248 924
Pooled small units 10,342 5,513
Carbon-capture retrofit options 85 320

The two example countries

Step 1: Units

The starting point is Global Energy Monitor's Global Integrated Power data (release of March 2026): one record per unit, with location, capacity, fuel, technology, start year, retirement year and status.

Step 2: Status

Status Treatment
Operating In the fleet
Retired Removed, unless the unit retired in or after the base year (2022). Those ran in the base year and stay, with their retirement date. Germany's last three reactors are the example.
Mothballed Kept as a separate group (prefix ep_m_) that can be brought back
Under construction In the fleet, with its future start year
Announced, pre-construction Not in the fleet. Offered to the model as an option to build.
Cancelled, shelved Removed. Hydro is the exception: cancelled and shelved hydro projects are kept as options, because the site still exists.

What happens to each status

In India this step removes 869 units, of which 759 are coal units totalling 584 GW: more coal than the country operates.

Step 3: Fuel, technology and numbers

Each unit gets a model fuel and technology from its Global Energy Monitor type, technology and fuel fields (tables below). Oil and gas units are split by their fuel detail.

Each unit then gets its own numbers: efficiency by technology, size and age; costs adjusted for size and world region; lifetime; and, for thermal units, the limits on flexible operation. See Costs and performance below.

Heat. Units that also supply heat are flagged from Global Energy Monitor's combined heat and power field, with a correction layer where that field is known to be wrong. A flagged unit gets a heat-to-power ratio by fuel and prime mover:

Unit type Maximum heat-to-power ratio Mode
Coal, steam 1.2 Extraction
Bioenergy, steam 2.3 Extraction
Gas combined cycle 0.5 Extraction
Gas or oil steam turbine 1.0 Extraction
Gas turbine, engine 1.0 Fixed (back-pressure)

About three quarters of Germany's coal and gas capacity supplies heat. Heat demand is placed at the nodes where these units stand.

Step 4: Large units individually, small units pooled

  • Above the threshold for its fuel, a unit keeps its identity: its own process in the model, at its grid node.
  • Below the threshold, units are pooled by fuel, technology, location and age. Thermal units pool at their grid node; solar and wind at their resource cluster.
  • Nuclear units are always individual.

Size thresholds

The size above which a unit is kept individually depends on the country and the fuel. A large system has a high threshold and a small system a low one, so every country ends up with a workable number of individual units.

Fuel Group Threshold Logic Rationale
Fossil Fuels (Coal, Gas, Oil) Combined threshold targeting ≤200 units Fossil plants create \~3x more model variables due to CCS retrofit options
Nuclear Always 0.0 (track all) Critical infrastructure requiring individual modeling
Hydro + Geothermal Combined threshold targeting ≤100 units Grid flexibility and storage characteristics
Solar/Wind Individual thresholds, minimum 200 MW Utility-scale focus with economic viability considerations
Other Renewables Default 50 MW threshold Standard renewable technology handling

Threshold Strategy by Fuel Type

System-Scale Examples:

Country Fossil (MW) Hydro (MW) Solar (MW) Wind (MW)
China (Large) 1000 1000 500 360
USA (Large) 860 190 200 260
Germany (Medium) 110 10 200 200
Small Countries 10 10 200 200

Threshold Variations by Country Scale

Configuration Source:

Thresholds are generated from the Global Energy Monitor data by Miscellaneous/count_power_plants_by_iso.py: for each fuel group, the threshold is the size of the Nth largest unit, where N is the target count, rounded to 10 MW.

Note

The complete threshold configuration is stored in assumptions/iso_fuel_capacity_thresholds.csv with metadata in assumptions/iso_fuel_capacity_thresholds_metadata.yaml.

Carbon-capture retrofits. Individual coal units of 300 MW or more, and gas and oil units of 400 MW or more, get a retrofit option (process name ending _rf). Pooled units do not. Retrofit cost and the penalties on efficiency and output come from the US Environmental Protection Agency's retrofit data.

Step 5: Fill the gaps

Unit data misses small and distributed capacity. Global Energy Monitor sees 19 GW of German solar in 2022; IRENA reports 61 GW. The pipeline adds the difference.

Renewables, from IRENA, year by year.

base year:    gap = IRENA capacity(2022) − unit capacity started by 2022
later years:  gap = IRENA increase in the year − unit capacity started that year

So the fleet follows IRENA's path through the latest statistical year, not only its base-year level.

Country Fuel Year Gap
Germany Solar 2022 / 2023 / 2024 41.8 / 9.3 / 8.4
India Wind 2022 8.6
India Bioenergy 2022 7.9
India Hydro 2022 4.0
India Solar 2023 / 2024 4.2 / 9.1

Gaps filled (GW)

Thermal, from Ember, in the base year. Where Ember reports more coal or gas capacity than the unit data holds, the difference is added.

Where the added capacity goes.

Fuel Placement
Solar By population. The missing solar is mostly rooftop, so it goes where people live.
Wind To resource clusters, by resource quality and existing wind capacity
Bioenergy, hydro To grid nodes
Coal, gas To grid nodes, by existing thermal capacity

Added capacity carries the same node or cluster commodities as real units, for example elc_spv_DEU_017.

Step 6: Check

The finished fleet is compared with three independent sources. The comparison is written to the Calibration sheet of each model's workbook.

Quantity Compared with Fuels
Capacity IRENA and Ember All
Generation IRENA and Ember (capacity × reported utilisation) All
Fuel use UN energy statistics (generation ÷ unit efficiency) Thermal

The check is a report, not a forced match. Differences that remain are visible. Known ones include definitions that differ between sources (pumped storage in hydro) and a mapping problem for oil capacity.

Costs and performance

Technology Cost Assignment

Every unit receives cost and performance parameters from ep_technoeconomic_assumptions.xlsx, adjusted for region and size.

Cost Parameter Integration

Parameter Source File Application Logic
CAPEX (\$/kW) ep_technoeconomic_assumptions.xlsx Technology + size class + regional multiplier
Fixed O&M (\$/kW-yr) ep_technoeconomic_assumptions.xlsx Annual fixed operating costs
Variable O&M (\$/MWh) ep_technoeconomic_assumptions.xlsx Per-MWh operating costs
Thermal Efficiency (%) VS_mappings.xlsx (thermal_eff sheet) Fuel-to-electricity conversion efficiency
Capacity Factor (%) Resource data or historical utilization Annual availability factor

Techno-Economic Parameter Sources

Regional Cost Adjustments

Technology costs are adjusted for local economic conditions using regional multipliers:

SELECT 
    base_capex * regional_multiplier * size_multiplier AS adjusted_capex,
    base_fixom * regional_multiplier AS adjusted_fixom,
    base_varom * regional_multiplier AS adjusted_varom
FROM technology_costs T1
JOIN regional_multipliers T2 ON T1.region = T2.region
JOIN size_multipliers T3 ON T1.size_class = T3.size_class

Technology Cost Inheritance Formula

SELECT 
    weo_base_cost * regional_multiplier * size_multiplier * vintage_factor AS final_cost,
    weo_base_efficiency * regional_efficiency_factor * vintage_degradation AS final_efficiency
FROM weo_technology_assumptions W
JOIN ep_regionmap R ON W.region = R.region  
JOIN regional_multipliers M ON R.region = M.region
WHERE R.iso = '{country_iso_code}'

Life Extension Cost Integration

VerveStacks includes life extension costs, which capture the economic reality of aging thermal infrastructure. As power plants approach the end of their design life, operators face critical investment decisions: retire the facility or invest in major refurbishments to extend operational life.

The life extension cost methodology follows the approach established in EPA's Integrated Planning Model (IPM) version 6, which recognizes that thermal power plants can operate beyond their original design life through substantial capital investments. These costs reflect the reality that aging infrastructure requires major overhauls of critical components including boilers, turbines, generators, and environmental control systems.

Technology Type Design Life (years) Life Extension Cost (\$/kW)
Biomass Steam 40 \$253
Coal Steam 40 \$203
Combined Cycle Gas Turbine 30 \$82
Combustion Turbine (Peaker) 30 \$242
Internal Combustion Engine 30 \$226
Oil/Gas Steam 40 \$174
Integrated Gasification Combined Cycle 40 \$258
Landfill Gas 20 \$135

Life Extension Cost Assumptions (IPM v6 Methodology)

Economic Logic and Implementation

The life extension cost framework operates on the principle that thermal power plants face discrete investment decisions at the end of their design life. Plants that have reached their original lifespan can continue operating only if operators invest in major refurbishments that essentially reset the plant's operational capability.

Key characteristics of the life extension cost methodology:

  • Threshold-Based Application: Life extension costs are triggered only when plants operate beyond their technology-specific design life
  • Technology-Specific Costs: Reflect the varying complexity and capital intensity of different thermal technologies
  • One-Time Investment: Life extension costs represent a discrete capital investment, not ongoing maintenance
  • Operational Realism: Captures the actual decision-making process utilities face with aging assets

Technology-Specific Considerations

The variation in life extension costs across technologies reflects fundamental differences in plant complexity and refurbishment requirements:

  • Combined Cycle Gas Turbines (\$82/kW): Lower costs reflect modular design and standardized components
  • Coal Steam Plants (\$203/kW): Moderate costs for mature technology with established refurbishment practices
  • IGCC Plants (\$258/kW): Highest costs due to complex gasification systems and limited operational experience
  • Combustion Turbines (\$242/kW): High costs despite simple design due to intensive operational duty cycles

This approach ensures that fossil plant retirement decisions reflect realistic economics rather than arbitrary assumptions, enabling more accurate modeling of energy transition pathways and stranded asset risks.

Unit Commitment Parameter Integration

Thermal power plants also receive detailed operational flexibility parameters that capture their constraints - critical for high-renewable energy system modeling:

Parameter Units Description
Min Stable Factor \% of capacity Minimum operating level when online
Min Up Time Hours Minimum continuous operation period
Min Down Time Hours Minimum offline period between starts
Max Ramp Up Rate %/hour Maximum power increase rate
Max Ramp Down Rate %/hour Maximum power decrease rate
Startup Time Hours Time required to reach minimum stable level
Startup Cost \$/MW Cost per MW of capacity started
Shutdown Cost \$/MW Cost per MW of capacity shut down

Unit Commitment Parameters Added to Thermal Plants

The system uses pattern matching to assign appropriate unit commitment characteristics based on technology type (coal, gas CCGT, gas OCGT, nuclear) and plant size class (Small/Medium/Large/XLarge).

Complete Assumption Tables

VS_mappings.xlsx Reference Tables

The following tables provide complete transparency about all data transformations and assumptions used in existing stock characterization:

Data Sources Documentation

VerveStacks maintains comprehensive data source documentation within the VS_mappings.xlsx file to ensure complete transparency and reproducibility:

Data Source Content & Coverage Update Frequency Quality
Global Energy Monitor (GEM) Individual power units worldwide (March 2026 release) Monthly updates ⭐⭐⭐⭐⭐
IRENA Statistics National renewable capacity & generation, annual Annual updates ⭐⭐⭐⭐⭐
EMBER Climate Electricity generation and capacity by country and fuel, annual and monthly Annual updates ⭐⭐⭐⭐⭐
World Energy Outlook (WEO) Technology costs & performance by region Annual updates ⭐⭐⭐⭐⭐
UNSD Energy Statistics UN energy balances & trade flows Annual updates ⭐⭐⭐⭐
REZoning Database 50x50km renewable resource potential grid Static analysis ⭐⭐⭐⭐
ERA5 Weather Hourly solar and wind profiles (default weather year 2013) Historical data ⭐⭐⭐⭐⭐
EPA CCS Retrofit Carbon capture retrofit potential & costs Periodic updates ⭐⭐⭐⭐

Primary Data Sources and Update Frequencies

Data Integration Methodology

Priority Data Source Usage Logic
1st Priority GEM Plant Database Individual unit specifications above the country's fuel-specific threshold
2nd Priority IRENA Statistics Fill renewable capacity gaps year by year
3rd Priority EMBER Statistics Fill coal and gas capacity gaps in the base year
4th Priority WEO Assumptions Technology costs & performance parameters
5th Priority Default Values Conservative fallbacks for missing parameters

Source Integration Hierarchy

GEM Technology Mapping (gem_techmap)

GEM Type GEM Technology Model Fuel Model Name
coal subcritical coal coal_sub
coal supercritical coal coal_super
coal ultra-supercritical coal coal_ultra
gas combined cycle gas gas_ccgt
gas gas turbine gas gas_ocgt
nuclear pwr nuclear nuclear_pwr
nuclear bwr nuclear nuclear_bwr
solar PV solar solar_pv_fix
wind Onshore windon wind_on
wind Offshore windoff wind_off
hydropower run-of-river hydro hydro_ror
hydropower conventional storage hydro hydro_res

Technology Standardization Rules

IRENA-EMBER Type Mapping (irena_ember_typemap)

Type Source Model Fuel Description
Solar photovoltaic IRENA solar All solar PV installations
Wind energy IRENA windon Onshore wind turbines
Offshore wind energy IRENA windoff Offshore wind turbines
Hydropower IRENA hydro All hydroelectric generation
Coal EMBER coal All coal-fired generation
Gas EMBER gas All natural gas generation
Oil EMBER oil Oil-fired generation
Bioenergy IRENA bioenergy Biomass and biogas generation
Geothermal IRENA geothermal Geothermal energy generation

Statistical Data Harmonization

Technology Classification Tables

WEO Power Generation Technologies (weo_pg_techs)

Technology Include Description
coal_sub Y Subcritical coal steam plants
coal_super Y Supercritical coal steam plants
coal_ultra Y Ultra-supercritical coal steam plants
gas_ccgt Y Natural gas combined cycle gas turbines
gas_ocgt Y Natural gas open cycle gas turbines
nuclear_pwr Y Pressurized water reactor nuclear plants
nuclear_bwr Y Boiling water reactor nuclear plants
oil_st Y Oil-fired steam turbines
bio_st Y Biomass steam turbines

Thermal Technology Definitions

Storage Technologies (storage_techs)

Demand Technologies (dem_techs)

Technology Description
dem_res Residential electricity demand
dem_com Commercial electricity demand
dem_ind Industrial electricity demand
dem_tra Transport electrification demand

Demand Sector Definitions

Techno-Economic Assumptions Reference

Technology Assumptions Database Structure

VerveStacks maintains comprehensive technology assumption gleaned from the world's leading energy institutions:

Core Technology Parameters

Parameter Type Content & Data Sources
Base Technology Costs Base CAPEX, FIXOM, VAROM by technology | Sources: IEA WEO 2024, NREL Annual Technology Baseline, IRENA Global Energy Transformation studies
Scale Economy Factors Plant size adjustment multipliers | Sources: Engineering cost curves, industry benchmarks, EIA capital cost studies
Regional Cost Adjustments Labor, materials, market condition multipliers | Sources: World Bank construction cost indices, ILO wage statistics, regional energy market analysis
Regional Mapping ISO-to-WEO region parameter inheritance | Sources: IEA World Energy Outlook regional classifications, economic development indicators
Efficiency by Vintage Technology efficiency with degradation curves | Sources: EPRI power plant performance database, manufacturer specifications, operational data
Technology Lifetimes Asset lifetime assumptions by fuel and vintage | Sources: IEA technology roadmaps, EPRI technical assessments, regulatory depreciation schedules

Techno-Economic Parameter Categories

Advanced Operational Parameters

Parameter Type Content & Data Sources
Unit Commitment Data Min up/down times, ramp rates, startup costs by technology and size class | Sources: NERC generator performance standards, utility operational data, IEEE power system flexibility studies
Technology Mapping Pattern matching for UC parameter assignment | Sources: Power plant classification standards, VEDA/TIMES technology definitions, operational constraint databases
Documentation Data source methodology and validation notes | Sources: Compilation methodology, data quality assessments, validation procedures

Unit Commitment Parameter Categories

WEO Technology Cost Integration

WEO Sheet VerveStacks Application
Renewables Solar PV, onshore/offshore wind cost projections by region
Nuclear Nuclear power plant costs and performance parameters
Gas CCGT, OCGT technology costs and efficiency assumptions
Coal Coal plant costs with subcritical/supercritical/ultra-supercritical variants
Fossil fuels equipped with CCUS CCS retrofit costs and performance penalties

WEO 2024 Power Generation Assumptions Integration

Authoritative Data Sources Summary

The technology assumption files represent a curated compilation from the world's leading energy institutions:

Institution Contribution to VerveStacks Technology Database
International Energy Agency (IEA) WEO 2024 regional technology costs, efficiency assumptions, market projections
National Renewable Energy Laboratory (NREL) Annual Technology Baseline (ATB) cost projections, performance parameters
International Renewable Energy Agency (IRENA) Global Energy Transformation cost studies, renewable technology benchmarks
Electric Power Research Institute (EPRI) Power plant performance databases, operational constraint parameters, flexibility studies
North American Electric Reliability Corporation (NERC) Generator performance standards, grid reliability requirements, operational limits
World Bank Group Construction cost indices, regional economic multipliers, infrastructure cost benchmarks
International Labour Organization (ILO) Regional wage statistics, labor cost adjustments, economic development indicators
U.S. Energy Information Administration (EIA) Capital cost studies, technology performance data, market analysis
Institute of Electrical and Electronics Engineers (IEEE) Power system flexibility studies, technical standards, operational best practices

Primary Institutional Sources

Data Quality and Validation Standards

Validation Level Quality Control Process
Source Verification All parameters traced to peer-reviewed publications or institutional databases
Cross-Reference Validation Multiple source comparison for consistency (IEA vs NREL vs IRENA)
Regional Calibration Local market conditions validated against national energy statistics
Temporal Consistency Technology cost trends validated against historical deployment data
Operational Validation Unit commitment parameters validated against actual plant performance data

Quality Assurance Framework

Complete Technology Assumption Tables

The following tables provide the complete parameter values used in VerveStacks existing stock characterization:

Base Technology Efficiency

Technology Efficiency by Commissioning Year (by size class)

size model_name 2020 2010 2000 1990 … 1920
> 300MW ep_bioenergy 0.35 0.33 0.31 0.285 0.2
> 300MW ep_coal_CFB 0.385 0.375 0.365 0.35 0.28
> 300MW ep_coal_IGCC 0.435 0.42 0.41 0.4 0.32
> 300MW ep_coal_subcritical 0.36 0.36 0.36 0.36 0.225
> 300MW ep_coal_subcritical_CCS 0.305 0.3 0.3 0.3 0.24
> 300MW ep_coal_supercritical 0.425 0.415 0.395 0.39 0.3
> 300MW ep_coal_supercritical_CCS 0.355 0.35 0.34 0.33 0.24
> 300MW ep_coal_ultra-supercritical 0.445 0.435 0.42 0.41 0.31
> 300MW ep_coal_ultra-supercritical_CCS 0.385 0.375 0.36 0.35 0.25
> 300MW ep_gas_internal_combustion 0.36 0.355 0.345 0.33 0.265
> 300MW ep_oil_internal_combustion 0.355 0.35 0.34 0.325 0.26
> 300MW ep_gas_combined_cycle 0.6 0.58 0.545 0.525 0.36
> 300MW ep_oil_combined_cycle 0.58 0.56 0.52 0.5 0.34
> 300MW ep_gas_gas_turbine 0.33 0.32 0.3 0.275 0.2
> 300MW ep_oil_gas_turbine 0.32 0.31 0.29 0.265 0.19
> 300MW ep_gas_steam_turbine 0.365 0.365 0.36 0.35 0.25
> 300MW ep_oil_steam_turbine 0.355 0.355 0.35 0.34 0.24
50-300MW ep_bioenergy 0.33 0.31 0.29 0.265 0.19
50-300MW ep_coal_CFB 0.365 0.355 0.345 0.33 0.26
50-300MW ep_coal_IGCC 0.415 0.4 0.39 0.38 0.3
50-300MW ep_coal_subcritical 0.34 0.34 0.34 0.34 0.215
50-300MW ep_coal_subcritical_CCS 0.285 0.28 0.28 0.28 0.22
50-300MW ep_coal_supercritical 0.405 0.395 0.375 0.37 0.28
50-300MW ep_coal_supercritical_CCS 0.335 0.33 0.32 0.31 0.22
50-300MW ep_coal_ultra-supercritical 0.425 0.415 0.4 0.39 0.29
50-300MW ep_coal_ultra-supercritical_CCS 0.365 0.355 0.34 0.33 0.23
50-300MW ep_gas_internal_combustion 0.36 0.355 0.345 0.33 0.265
50-300MW ep_oil_internal_combustion 0.355 0.35 0.34 0.325 0.26
50-300MW ep_gas_combined_cycle 0.58 0.56 0.52 0.5 0.34
50-300MW ep_oil_combined_cycle 0.56 0.54 0.5 0.48 0.32
50-300MW ep_gas_gas_turbine 0.32 0.31 0.29 0.265 0.19
50-300MW ep_oil_gas_turbine 0.31 0.3 0.28 0.255 0.18
50-300MW ep_gas_steam_turbine 0.345 0.345 0.34 0.33 0.24
50-300MW ep_oil_steam_turbine 0.335 0.335 0.33 0.32 0.23
<50MW ep_bioenergy 0.32 0.3 0.28 0.255 0.18
<50MW ep_coal_CFB 0.355 0.345 0.335 0.32 0.25
<50MW ep_coal_IGCC 0.395 0.38 0.37 0.36 0.28
<50MW ep_coal_subcritical 0.33 0.33 0.33 0.33 0.205
<50MW ep_coal_subcritical_CCS 0.265 0.26 0.26 0.26 0.2
<50MW ep_coal_supercritical 0.385 0.375 0.355 0.35 0.26
<50MW ep_coal_supercritical_CCS 0.315 0.31 0.3 0.29 0.2
<50MW ep_coal_ultra-supercritical 0.405 0.395 0.38 0.37 0.27
<50MW ep_coal_ultra-supercritical_CCS 0.345 0.335 0.32 0.31 0.21
<50MW ep_gas_internal_combustion 0.36 0.355 0.345 0.33 0.265
<50MW ep_oil_internal_combustion 0.355 0.35 0.34 0.325 0.26
<50MW ep_gas_combined_cycle 0.56 0.54 0.5 0.48 0.32
<50MW ep_oil_combined_cycle 0.54 0.52 0.48 0.46 0.3
<50MW ep_gas_gas_turbine 0.31 0.3 0.28 0.255 0.18
<50MW ep_oil_gas_turbine 0.3 0.29 0.27 0.245 0.17
<50MW ep_gas_steam_turbine 0.335 0.335 0.33 0.32 0.23
<50MW ep_oil_steam_turbine 0.325 0.325 0.32 0.31 0.22

Base Technology Costs

Technology Cost Parameters (CAPEX $/kW, FIXOM $/kW-yr, VAROM $/MWh)

model_name capex fixom varom
ep_bioenergy 3500 130 8
ep_coal_CFB 2300 65 6
ep_coal_IGCC 4200 120 6
ep_coal_subcritical 2000 60 5
ep_coal_subcritical_CCS 3600 110 7
ep_coal_supercritical 2200 65 5.5
ep_coal_supercritical_CCS 3700 115 7.5
ep_coal_ultra-supercritical 2400 70 5.5
ep_coal_ultra-supercritical_CCS 3900 120 7.5
ep_geothermal 4200 130 5
ep_hydro_dam 2500 50 2
ep_hydro_ror 2200 55 2.5
ep_hydro_ps 1800 40 1.5
ep_nuclear 6500 150 4
ep_nuclear_smr 8500 180 4
ep_gas_internal_combustion 1100 45 6.5
ep_oil_internal_combustion 1000 40 6.5
ep_gas_combined_cycle 1000 30 3
ep_oil_combined_cycle 1100 35 3.5
ep_gas_gas_turbine 800 20 4
ep_oil_gas_turbine 900 22 4.5
ep_gas_steam_turbine 1200 40 4.5
ep_oil_steam_turbine 1300 45 5
ep_solar_PV 900 15 0
ep_solar_thermal 5500 65 2
ep_wind_offshore 4000 100 3
ep_wind_onshore 1600 40 2

Size-Based Cost Multipliers

Scale Economy Adjustments by Plant Size

size capex fixom varom
>300MW 1 1 1
50-300MW 1.15 1.1 1.1
<50MW 1.35 1.3 1.2

Regional Cost Multipliers

Regional Economic Adjustments by WEO Region

region efficiency capex fixom varom Notes
European Union 1.03 1.1 1.1 1.05 High-cost, high-tech region; strict efficiency standards
United States 1 1 1 1 Baseline for many international benchmarks
Japan 1.02 1.2 1.15 1.05 High labor costs; small plant sites, advanced tech
Russia 0.92 0.8 0.85 0.9 Legacy stock + low labor costs; older designs
China 1 0.75 0.8 0.8 Local EPC firms dominate; ultra-supercritical widespread
India 0.96 0.7 0.75 0.8 Domestic tech, moderate efficiency gains post-2000
Middle East 0.93 0.9 0.95 0.95 Harsh ambient conditions lower GT efficiency
Africa 0.9 0.85 0.9 0.9 Smaller plants, older tech, fewer advanced designs
Brazil 0.96 0.85 0.9 0.9 CCGT fleet newer, other tech mid-efficiency

Technology Lifetimes

Asset Lifetime Assumptions by Technology

model_name life
ep_bioenergy 50
ep_coal_CFB 50
ep_coal_IGCC 50
ep_coal_subcritical 50
ep_coal_subcritical_CCS 50
ep_coal_supercritical 50
ep_coal_supercritical_CCS 50
ep_coal_ultra-supercritical 50
ep_coal_ultra-supercritical_CCS 50
ep_geothermal 50
ep_hydro_dam 100
ep_hydro_ror 100
ep_hydro_ps 100
ep_nuclear 50
ep_nuclear_smr 50
ep_gas_internal_combustion 40
ep_oil_internal_combustion 40
ep_gas_combined_cycle 50
ep_oil_combined_cycle 50
ep_gas_gas_turbine 40
ep_oil_gas_turbine 40
ep_gas_steam_turbine 50
ep_oil_steam_turbine 50
ep_solar_PV 30
ep_solar_thermal 30
ep_wind_offshore 30
ep_wind_onshore 30

How Plant Lifetimes Are Assigned

Each existing plant is assigned a lifetime using a two-priority rule:

  1. Known retirement date (highest priority). When the source data records a specific retirement year for an individually-tracked plant, the lifetime is set to exactly that span — commissioning year to retirement year. This reflects scheduled closures, regulatory mandates, or operator decisions already captured in the underlying plant database.
  2. No known retirement date (default). The lifetime is set to whichever is longer: the technology design life from the table above, or the number of years remaining between the plant's commissioning year and 2055. The 2055 floor is a deliberate modeling convention — it ensures that no existing plant drops out of the model before the end of the planning horizon, avoiding artificial capacity cliffs in mid-period years.

The practical effect of the 2055 floor is most visible for legacy plants commissioned in the 1960s and 1970s: a coal unit from 1971 would have exhausted its 50-year design life well before 2055, so it receives a lifetime of 84 years (2055 − 1971) instead. Modern plants commissioned after 2005 are typically governed by the design life rather than the floor.

Plant COD Design life 2055 − COD Assigned lifetime
Medupi U6 (supercritical coal) 2015 50 yrs 40 yrs 50 yrs (design life)
Kusile U3 (supercritical coal) 2021 50 yrs 34 yrs 50 yrs (design life)
Legacy subcritical unit 1971 50 yrs 84 yrs 84 yrs (2055 floor)
Plant with known closure in 2035 2000 — — 35 yrs (explicit retirement)

Illustrative Lifetime Outcomes

Note

If a coal phase-out policy or early retirement scenario is being modeled, the correct mechanism is to record a retirement year against the affected plants in the source database. This takes priority over both the design life and the 2055 floor, and is the only way to force retirement before the horizon ends.

CCS Retrofit Lifetime

Carbon capture retrofit options are treated as discrete 20-year investments, regardless of the age or technology type of the host plant. This follows the approach used in the EPA Integrated Planning Model (IPM v6), which frames post-combustion capture additions as a bounded capital commitment rather than a permanent life extension of the underlying asset.

Unit Commitment Parameters

Operational Constraints by Technology and Size Class

technology Size Class Min Stable Factor (%) Min Up Time (h) Min Down Time (h) Max Ramp Up (%/h) Max Ramp Down (%/h) Startup Time (h) Startup Cost ($/MW) Shutdown Cost ($/MW) decomissioning_cost
OCGT (Peaker) <50 MW 25 0.5 0.5 120 120 0.5 10 2 50
OCGT (Peaker) 50-200 MW 30 1 1 100 100 0.75 15 4 40
OCGT (Peaker) >200 MW 35 1.5 1.5 80 80 1.25 20 6 30
CCGT <300 MW 50 2 2 60 60 1.75 25 6 60
CCGT >300 MW 55 4 4 45 45 3 40 9 50
Gas/Oil Steam <200 MW 35 3 3 40 40 2 25 5 70
Gas/Oil Steam >200 MW 40 5 5 30 30 3 35 7 60
Diesel <20 MW 30 1 1 120 120 0.4 10 2 40
Diesel >20 MW 35 2 2 60 60 1.5 20 6 30
Subcritical Coal <300 MW 38 5 5 30 30 5 40 10 100
Subcritical Coal >300 MW 42 7 7 20 20 8 60 14 90
Supercritical Coal <500 MW 45 6 6 25 25 6 50 12 110
Supercritical Coal >500 MW 48 8 8 15 15 9 70 16 100
Nuclear All 70 24 24 5 5 48 100 50 500

Unit Commitment Technology Mapping

Pattern Matching Rules for UC Parameter Assignment

technology model_name
CCGT ep_gas_combined_cycle,ep_oil_combined_cycle
Diesel ep_gas_internal_combustion,ep_oil_internal_combustion
Gas/Oil Steam ep_gas_steam_turbine,ep_oil_steam_turbine
Nuclear ep_nuclear,ep_nuclear_smr
OCGT (Peaker) ep_gas_gas_turbine,ep_oil_gas_turbine
Subcritical Coal ep_bioenergy,ep_coal_CFB,ep_coal_IGCC,ep_coal_subcritical,ep_coal_subcritical_CCS
Supercritical Coal ep_coal_supercritical,ep_coal_supercritical_CCS,ep_coal_ultra-supercritical,ep_coal_ultra-supercritical_CCS

Technology Classification Tables

GEM Technology Mapping

GEM Fuel-Technology Combinations to VerveStacks Model Names

Type Technology model_fuel model_tech model_name
bioenergy bioenergy bioenergy ep_bioenergy
coal CFB coal CFB ep_coal_CFB
coal IGCC coal IGCC ep_coal_IGCC
coal subcritical coal subcritical ep_coal_subcritical
coal subcritical/CCS coal subcritical_CCS ep_coal_subcritical_CCS
coal supercritical coal supercritical ep_coal_supercritical
coal supercritical/CCS coal supercritical_CCS ep_coal_supercritical_CCS
coal ultra-supercritical coal ultra-supercritical ep_coal_ultra-supercritical
coal ultra-supercritical/CCS coal ultra-supercritical_CCS ep_coal_ultra-supercritical_CCS
coal unknown coal subcritical ep_coal_subcritical
coal unknown/CCS coal supercritical_CCS ep_coal_supercritical_CCS
geothermal advanced geothermal systems (AGS) geothermal ep_geothermal
geothermal binary cycle geothermal ep_geothermal
geothermal dry steam geothermal ep_geothermal
geothermal enhanced geothermal systems (EGS) geothermal ep_geothermal
geothermal flash steam - double geothermal ep_geothermal
geothermal flash steam - single geothermal ep_geothermal
geothermal flash steam - triple geothermal ep_geothermal
geothermal flash steam - unknown geothermal ep_geothermal
geothermal geopressured geothermal system (GGS) geothermal ep_geothermal
geothermal unknown type geothermal ep_geothermal
hydropower conventional and pumped storage hydro dam ep_hydro_dam
hydropower conventional and run-of-river hydro ror ep_hydro_ror
hydropower conventional storage hydro dam ep_hydro_dam
hydropower pumped storage hydro ps ep_hydro_ps
hydropower run-of-river hydro ror ep_hydro_ror
hydropower unknown hydro ror ep_hydro_ror
nuclear boiling water reactor nuclear ep_nuclear
nuclear fast breeder reactor nuclear ep_nuclear
nuclear fast neutron reactor nuclear ep_nuclear
nuclear gas-cooled reactor nuclear ep_nuclear
nuclear high temperature gas reactor nuclear ep_nuclear
nuclear light water graphite reactor nuclear ep_nuclear
nuclear liquid-metal-cooled fast reactor nuclear ep_nuclear
nuclear molten salt reactor nuclear ep_nuclear
nuclear pressurized heavy water reactor nuclear ep_nuclear
nuclear pressurized water reactor nuclear ep_nuclear
nuclear small modular reactor nuclear smr ep_nuclear_smr
nuclear unknown nuclear ep_nuclear
oil/gas ICCC gas internal_combustion ep_gas_internal_combustion
oil/gas ICCC oil internal_combustion ep_oil_internal_combustion
oil/gas IGCC gas combined_cycle ep_gas_combined_cycle
oil/gas ISCC gas combined_cycle ep_gas_combined_cycle
oil/gas combined cycle gas combined_cycle ep_gas_combined_cycle
oil/gas combined cycle oil combined_cycle ep_oil_combined_cycle
oil/gas gas turbine gas gas_turbine ep_gas_gas_turbine
oil/gas gas turbine oil gas_turbine ep_oil_gas_turbine
oil/gas internal combustion gas internal_combustion ep_gas_internal_combustion
oil/gas internal combustion oil internal_combustion ep_oil_internal_combustion
oil/gas steam turbine gas steam_turbine ep_gas_steam_turbine
oil/gas steam turbine oil steam_turbine ep_oil_steam_turbine
oil/gas unknown gas steam_turbine ep_gas_steam_turbine
oil/gas unknown oil steam_turbine ep_oil_steam_turbine
solar Assumed PV solar pv ep_solar_pv
solar PV solar pv ep_solar_pv
solar Solar Thermal solar thermal ep_solar_thermal
wind Offshore floating windoff wind ep_windoff_wind
wind Offshore hard mount windoff wind ep_windoff_wind
wind Offshore mount unknown windoff wind ep_windoff_wind
wind Onshore windon wind ep_windon_wind
wind Unknown windon wind ep_windon_wind

IRENA-EMBER Type Mapping

Statistical Data Source Harmonization

Source Type model_fuel model_tech
EMBER Bioenergy bioenergy bioenergy
EMBER Other Renewables bioenergy bioenergy
EMBER Coal coal coal
EMBER Gas gas gas
EMBER Other Fossil oil oil
EMBER Hydro hydro hydro
EMBER Nuclear nuclear nuclear
EMBER Solar solar solar
EMBER Wind windon windon
IRENA Biogas bioenergy bioenergy
IRENA Liquid biofuels bioenergy bioenergy
IRENA Renewable municipal waste bioenergy bioenergy
IRENA Solid biofuels bioenergy bioenergy
IRENA Coal and peat coal coal
IRENA Fossil fuels n.e.s. oil oil
IRENA Natural gas gas gas
IRENA Oil oil oil
IRENA Other non-renewable energy oil oil
IRENA Geothermal energy geothermal geothermal
IRENA Mixed Hydro Plants hydro hydro
IRENA Pumped storage hydro ps
IRENA Renewable hydropower hydro hydro
IRENA Nuclear nuclear nuclear
IRENA Solar photovoltaic solar solar pv
IRENA Solar thermal energy solar csp
IRENA Offshore wind energy windoff offshore
IRENA Onshore wind energy windon onshore

WEO Power Generation Technologies

IEA WEO Technology Classifications

tech
Bioenergy + CCUS
Bioenergy - Large scale unit
CCGT
CCGT + CCS
Coal + CCS
Gas turbine
IGCC
IGCC + CCS
Nuclear large
Oxyfuel + CCS
Steam Coal - SUBCRITICAL
Steam Coal - SUPERCRITICAL
Steam Coal - ULTRASUPERCRITICAL

Storage Technologies

Storage Technology Definitions

tech description
EN_STG8hbNREL 8-hour utility storage battery - NREL
EN_STG4hbNREL 4-hour utility storage battery - NREL

Data Quality and Validation

How much the gap-fill adds varies widely. It is small for large thermal fleets and large for distributed renewables.

Example Share of capacity that comes from the gap-fill
Germany, solar, 2022 About two thirds
India, bioenergy, 2022 About three quarters

Defaults when a field is missing.

Missing Default
Efficiency The typical value for the technology and vintage
Start year 2028 for units under construction; 2015 otherwise
Location The unit is attached at country level and reported

Lifetime. Units that would retire before 2055 on their technical lifetime are kept available to 2055, with the cost of life extension.

The comparison with IRENA, Ember and UN statistics is described in Step 6 above.